Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Был на сайте вчера в 19:59

Кандидат

Мужчина, 31 год, родился 29 июля 1993

Активно ищет работу

Актобе, готов к переезду, готов к командировкам

Mechanical Engineer/Piping Engineer/Piping Designer

600 000  на руки

Специализации:
  • Другое

Занятость: полная занятость, проектная работа

График работы: полный день, вахтовый метод

Опыт работы 8 лет

Ноябрь 2023Июль 2024
9 месяцев
SICIM Kazakhstan LLP.

Нефть и газ... Показать еще

Offshore Mechanical WorkPack Preparation Engineer
Make field inspections and determine the scope of the activities required to execute the preventive, corrective and predictive tasks identified.  submitting of necessary information, log sheets and reports regarding progress of the work packs completed and any identification of any issues preventing and completion, generates work plan compliance and performance reports. Prepare risk assessment for planned work.  Develop work pack and update the SAP Work Orders for maintenance jobs with necessary tasks, estimate hours, discipline, materials, special tools and services to allow efficient scheduling, assignment and execution of maintenance work.  Determine materials not meeting ROS (Required On Site Date) dates and perform rough cut schedule. Follow up the buyers if required.  Conduct materials bagging and tagging and physical checks the quality and quantity of materials or spares in the staging areas, with materials Coordinators.  Create, use and maintain technical files to include information in current work packs and to anticipate and avoid job delays.  Liaise with other discipline Supervisors, Operations, Planning and support services to ensure successful execution of work.  Develop technical competencies and skills. Attend key meetings. Achieve skill level as Work preparer in Process.  Responsible for strict adherence to site safety practices, operation and maintenance management procedures, ROK requirements and international standarts.  Analyze IWR, Preparing plan for site welding, check materials, certificates related work activities.  Develop work packs for Turnaround in soft program of "ROSER SYSTEM"
Сентябрь 2020Декабрь 2022
2 года 4 месяца
Wellhead Pressure and Management Project, FGP, KPJV (Kazakh Project Joint Venture) via KGNT

Нефть и газ... Показать еще

Senior Mechanical and Piping engineer
Report to the Piping Discipline Head, the main function of the role is to execute designing and drafting activities.  Responsible for leadership of a functional area on a small project or a segment of a larger project.  Manage the design group on executing the assigned design and drafting activities following the instructions given by the Area Lead Piping Engineer in accordance with the quality system in force within the Discipline, TCO procedures, job requirements, and time schedule.  Provide day-to-day technical support to Operations and Maintenance to troubleshoot and fix rotating equipment and mechanical systems.  Update and maintain engineering documentation and drawings.  Have experience with rotating equipment and piping filed installation, commissioning and testing.  Assist and develop Plot plan and Equipment layouts, 2D Piping General Arrangement Drawings and 3D model based on the study layouts.  Prepare isometric sketches for all Stress critical lines with the possible support locations and deal with the stress engineer to carry out stress analysis.  Responsible for design, specification and services related to piping systems and piping layout including piping material selection, piping material line classes, standard and specialty piping components, pressure, weight and thermal analysis of piping systems, vibration analysis and piping support systems.  Assist, remodel and update the model based on the Internal, Client reviews, latest Supplier information and Isometric checking comments and maintain the clash free model.  Position involved managing a team of designers and engineers.  Lead, plan, budget, organize, coordinate and control the project and responsible for employee performance appraisals, provide technical guidance and for coaching and developing lower level professionals
Май 2019Август 2020
1 год 4 месяца
TCO via Career Holding

Атырау

Строительство, недвижимость, эксплуатация, проектирование... Показать еще

3GI MEI Workface Planning Facilitator Piping/ Mechanical
 report to the Department Head, the main function of the role is to execute proper planning and facilitating activities.  responsible for leadership of a functional area on a Gathering system project.  support and manage Contractor WFP planners with the development and assembly of IWPs, ensuring that safety, quality and efficiency at the Workface are considered in the planning process in accordance with the quality system in force within the Discipline, TCO procedures, job requirements, and time schedule.  review Plot plan and Equipment layouts, 2D Piping General Arrangement Drawings, 3D model and isometric sketches, material availability reports.  coordinates with and provides construction knowledge to project schedulers, engineers, other WFP facilitators and superintendents.  identifies specific risks associated with executing the planned activities.  reviewing final IWP for completeness and accuracy.  constraint identification and clearance.  provide continuous support of the IWP process from initial IWP scoping sessions through to the IWP close out.
Июнь 2018Апрель 2019
11 месяцев
SICIM S.p.A Kazakhstan Branch

Атырау

Строительство, недвижимость, эксплуатация, проектирование... Показать еще

FGP MWP Workface Planner (Piping/Mech)
Develops the Workface Planning Implementation Plan, taking into account the requirements of Exhibit H, into a cohesive WFP execution strategy across all applicable CWPs.  Manages IWP coordination in support of the Path of Construction, CWP Installation Sequence Plan, and Schedule.  Facilitates IWP scoping sessions, constraint removal sessions and IWP closeout meetings.  Audits IWPs for completeness and compliance.  Works with construction schedulers.  Works with the Engineering organization and the constructability team to align Construction Work Packages (CWPs) sequence and IWPs sequence.  Ensures that the data required to build IWP packages is available and accurate.  Facilitates and expedites the removal of construction constraints throughout the Project.  Assists in the Project Controls Team to align their data management (Unit rates, milestones, quantities, and schedule) and reporting structure with the application of Workface Planning.  Works with team to help define and arrange their WFP training requirements.  Ensures good IWP record keeping in accordance with WFP department guidelines and procedures.  Assists the WFP manager as required.  Other duties as required.
Ноябрь 2017Июль 2018
9 месяцев
GATE inshaat Taahut Sanaii ve Tidjaret 3

Казахстан

Строительство, недвижимость, эксплуатация, проектирование... Показать еще

Quantity Surveyor Mechanical Engineer
Prepare and update material procurement schedule and material status and forwarding to head office.  Evaluates quotations obtained from different suppliers & subcontractors, ensures quantities and specifications are in line with tender and projects specifications.  Preparation of payment application and agreeing with Client.  Prepares cost estimate for different phases of the project, advices the project management on possible cost over runs and on the action necessary to remain within the approved project budget.  Works very close with the project team to ensure that measurements, variations and contractual matters are properly recorded and notified.  Performs material take offs prior to the purchase requisitions for the projects and reports any irregularities or discrepancies to the project management.  Performs and implements all post contract duties including but not limited to measurements, preparation of variations orders, analysis of site design changes, interim valuation certificates, final accounts & evaluation reports.  Ensures proper records of agreed measurement-oriented / Item rate variation with the client's authorized representative and ensures compliance with such rates is maintained.  Examines, controls and evaluates sub-contractor’s invoices and ensures the contractual obligations are satisfied and advices the project management on payments of the same.  Take off quantities from AFC drawings and for variations  Identify changes from AFC and Tender drawings  Requests for variations, compiling Pricing of VO based on Contract unit rates, VO submissions  Preparation of final account
Июнь 2016Ноябрь 2017
1 год 6 месяцев
ISKER GROUP

Атырау, isker-group.com

Строительство, недвижимость, эксплуатация, проектирование... Показать еще

Mechanical and Piping Engineer
 Design activities in EWRP buildings, designing of HVAC and piping (firewater, utility air, utility water systems and etc.) according to project standards and specifications using AutoCAD 2D & 3D.  developing plot plans, equipment layouts, isometrics and pipe routing layouts.  preparation of red lines (mark-up) on drawings during construction and submitting to the end user (proponent) for approval, prior to make the final as-built drawings.  verifying pipe supports, valves, guides, shoe supports and NDT completion and approving/releasing packages for hydro test.  perform Field Checks of Job cards.  issue Site Queries, Site Instructions when required.  ensure that all aspects of the project design comply with legal acts, safety and client requirements and procedures.  perform “as-built” of installed piping according to procedures.  coordinate with other disciplines and report any occurs which may delay the progress of the project.  issue reports (clash, Material traceability, weld summary and etc).  submit to Project standards, specifications, documents and drawings for issue.  obtain detailed knowledge of the site scope of the work.  keep working time, also participate in meetings as required in project.  perform other duties when instructed by superior.
Октябрь 2015Июнь 2016
9 месяцев
TOO L.Scarti

Актобе

Строительство, недвижимость, эксплуатация, проектирование... Показать еще

Production and Technical Department Engineer
 preparation of acts and control patches  making report

Навыки

Уровни владения навыками
AutoCAD
MS Outlook
Driving Licence B
Internet
Английский язык
Деловая переписка
Piping
project control
Design
Engineering
EPC
QS
SAP
ROZER
турецкий язык

Опыт вождения

Имеется собственный автомобиль

Права категории B

Высшее образование

2015
Актюбинский Региональный Государственный Университет Им. К. Жубанова
Иностранные Языки, Перевод и переводоведение

Знание языков

КазахскийРодной


АнглийскийC2 — В совершенстве


РусскийC2 — В совершенстве


ТурецкийA1 — Начальный


Гражданство, время в пути до работы

Гражданство: Казахстан

Разрешение на работу: Казахстан

Желательное время в пути до работы: Не имеет значения