Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online less than a week ago

Candidate

Male, 39 years, born on 1 April 1986

Actively searching for a job

Aktobe, willing to relocate (Uralsk), prepared for business trips

The approximate area of the job search is specified

Project Management, Project Manager, Project Engineer, Planning Engineer

Specializations:
  • Sales manager, account manager

Employment: full time

Work schedule: full day

Work experience 19 years 7 months

October 2014currently
10 years 8 months
“Sarmat Energy” LLP Aktau

Kazakhstan, www.sarmat.kz

Head of Project Management Department
To manage and control of the project stages: initiation and planning, control and monitoring; To control over basic parameters (time, cost, quality) to obtain the planned profit; To prepare calendar schedules for the implementation of the project; To plan the project budget, incl. identify the need for financing; To coordinate all project participants; To control the progress of the project implementation - monitoring the timing and financial flows of the project; To hold regular meetings with external project participants on the progress of the project; To analyse financial indicators for the project; To make decisions that will improve the timing and costs of the project; To control over fulfilment by parties if their obligations under concluded contracts; To initiate tenders for contractors selection; To make decisions on changing contractors; To control over commissioning of the facility; To control the official registration of documents for the facility / product (obtaining title documents). To identify and evaluate project risks. To develop administrative and regulatory documents for the implementation, maintenance and improvement of the department. Project Manager (in addition to other duties) To check the compliance of the scope of construction and installation works and facilities with the approved design estimates, working drawings, construction codes and rules, standards, technical specifications, and occupational safety standards. To participate in the review and approval of design changes arising during the construction process; to solve the issues of replacing materials, products, structures (without reducing the quality of construction sites). To analyse reasons for schedule disruptions and deterioration of the quality of construction and installation works, and to take part in their elimination. To check the estimate documentation for the facilities construction, calculate the cost, recorde the work performed. To keep a record of the completed construction and installation works and report on the implementation of construction plans. To prepare estimate documentation for additional work. To approve estimates, costing materials and additional costs, bill of quantities, specifications, and acceptance certificates with the engineering contractor and the customer. Cost Controlling and Planning Engineer To define the policy of using investment resources and distribute their concentration within the startup facilities. To manage/develop the project budget and provide operational guidance for several projects. To establish and maintain certain project cost management systems. To develop calendar schedules, detailed schedule with distributed resources (Labor, Non-Labor & Material), three-week schedule, and update progress weekly in Primavera Project Planner P6. To develop payment schedules (cash flow Inflow-Outflow) for materials, machinery and equipment, as well as services (Forecast Cash Flow - Materials, Equipments & Services accomplishment). To prepare reports on risk management, forecasting and wages analysis. To control the costs of the enterprise in accordance with the budget, including the development and implementation of cost control. To develop project costs control procedures and budget management and forecasting procedures. To determine financial benchmark for the duration of the project; To ensure the accuracy and timeliness of data collection for cost measurement; To evaluate project critical path using rigorous analysis and software tools to optimize the use of time, labor, equipment, materials and tools; To prepare progress report (daily, weekly, monthly), analysis of the future, forecasting, fulfilment of obligations to customers and analysis of measurements of earned value and quality; To prepare project management schedules (Gantt charts, histograms, logic diagrams, S-Curve); To use calendar and resource planning system on the basis of estimate and regulatory documentation; To forecast / report on project costs; To keep schedule throughout the life cycle of the project; To prepare proposals for making certain changes in the baseline (schedule) Project Engineer To develop and issue technical specifications for the design, technical. assignments and other documentation to contractors; To provide technical reequipment and reconstruction of the building capacities of the Company; To improve and reduce the cost of construction and installation works, improve construction works, quality, as well as reduce the time for their implementation; To participate in the preparation of tender documents and commercial proposals, and at particular project stages (Development of a Production Plan, development of a work schedule, calculation of physical volumes of work, development of welding procedures, installation of metal structures, pipelines, etc.); To check quality of works for compliance with the standards of SNiP, GOST, ANSI, ASTM t and requirements of the Customer; To carry out work on the delivery, acceptance and commissioning of facilities; To deal with subcontractors; to maintain subcontractors database (including price parameters); To identify and eliminate errors of all design sections before the work is done; To prepare daily, weekly, monthly reports for line personnel; To provide weekly construction supervision (technical supervision) at the fields during construction and installation works; To control keeping site documentation: acts of hidden work, logs, etc. To control over the use of resources and consumption of materials: To prepare cumulative statements on works, materials, mechanisms, subcontractors, etc.;
April 2013currently
12 years 2 months
"ARIADNA" LLP

Atyrau

Deputy Head of Technical Engineering Department
To control over construction and installation works in accordance with the approved design and estimate documentation (deadlines, work schedules) To analyse and eliminate comments on design and estimate documentation To calculate project scope of work and consumption of materials, to keep cumulative statements on materials To develop of method statements (with travel routes, place of production of machinery and equipment), technological maps To develop calendar schedules, detailed schedules with distributed resources, three-week schedules, progress on the Primavera P6 program, S-curve graphs, to keep track of the schedules To determine sequence, estimate the resources and duration of operations in order to develop the basic schedule To monitor state and control over changes in the basic schedule To update the schedule using Primavera P6 To prepare project progress reports, including management presentation To update S-Curves for Project Implementation To update histogram of resources, to collect performance information for processing data To control of compliance of construction and installation works and special works with design documentation and the requirements of regulatory documents for construction, to execute properly as-built documentation. To request for SEQ, to apply for material receipt (MR) with TCO To develop and issue technical specifications for the design, to issue of technical assignments and documentation to contractors To keep technical documentation for construction, verify acceptance certificate; writing-off of materials (М29); control over the formation of folders of delivery documentation. To draw up estimate calculation at the request of TCO. To carry out Management of Changes) To maintain tender documentation on ARIBA Sourcing (TCO) system, Project OnLine (KPJV) To develop presentation after awarding the contract for engineering and line staff To participate in the construction under the project: "Field testing of 50 piles for indentation, for pulling and horizontal loading"; "Drill cuttings area"; "IB-WEB Warehouse 21, 22 (earth works, grillage)", " Oil Tank Farm"
September 2010April 2013
2 years 8 months
"Batys Kommerts Stroy Service" LLP

Aktobe

Chief Engineer/Head of PTD
Project work planning: drawing up of detailed schedules of production; compilation of bill and schedules of resources; compilation of bill of materials and supply schedules. control of work execution: maintenance of internal project documentation; composition of job orders; compilation of weekly reports on the pace of construction, on the resources involved and on supplies; check for works quality compliance with SNiPs, requirements of the Customer; control of site documentation: acts of hidden works, logs, etc. control over the use of resources and consumption of materials: compilation of resource limit card, control of applications for resources and materials; compilation and maintenance of cumulative statements on works, materials, mechanisms, subcontractors, etc .; control of orders, timetables; control of write-off of M-29 materials; control of the use of mechanisms, writing off fuel; control of the work of subcontractors, verification and acceptance of the scope of work on forms F-2, F-3, writing-off of materials, etc. support and delivery of work performed: drawing up of as-built documentation in accordance with the SNiPs and the requirements of the Customer; drawing up acceptance, preparation and delivery of facilities to working commission and the state commission
January 2009June 2010
1 year 6 months
"Mark Kurylys Komplect" LLP

Aktobe

Head of Technical Engineering Department
- execution of tender documentation - monitoring the progress of work according to the work schedule - provision of subcontractors with technical information - control over documentation at the site - execution of the forms 2, 3 (acceptance certificate) - check for presence of permits and certificates for the materials used - execution of as-built technical documentation - prepare daily, weekly and final reports
June 2008December 2008
7 months
"TBM-Kazakhstan" LLP

Atyrau

Sales Representative
Duties: - Interaction with clients - Attracting new clients - Holding presentations
February 2007February 2008
1 year 1 month
"Advantek Systems" LLP

Almaty

Engineer of Design Department
Duties: - Design of system documents - Surveying - Logistic operations for construction - Examination of designs for further approval - Technical supervision of construction sites throughout the cities of Kazakhstan - Issue of as-built engineering documents for commissioning
June 2005January 2007
1 year 8 months
"Adil Stroy Expert" LLP

Aktobe

Specialist of Engineering Support
Duties: - Verification of compliance of performed works with the approved design, quality assessment - Determining of availability, form and issue correctness of as-built engineering documents on construction site - Determining of datasheets and certificates availability for employed construction materials, products, structures and equipment on site - Performance of technical supervision duties on construction site - Commissioning

Skills

Skill proficiency levels
Primavera P6
MS Office XP
MS Access
MS Outlook
ABC-4
SANA
AutoCAD
MS Project
MS Word
MS Excel
MS PowerPoint
Project management

Driving experience

Own car

Driver's license category B, C

About me

• high working capacity; • responsibility; • strong leader; • leader; • aiming at result; • negotiation skill; • proactive; • aspiration to learn.

Higher education

2008
Kazakh Leading Academy of Architecture and Civil Engineering (KAZGASA)
Construction and Engineering, Builder

Languages

KazakhNative


RussianC1 — Advanced


Professional development, courses

2018
Practice in Project Management
Project Management Technology, Management of Projects, Risks, Changes, Cost, Time, and Quality
2018
Project Management. Basic Course. ANSI IPM PMBOK GUIDE, 2013
Project Management Technology, Management of Projects, Risks, Changes, Cost, Time, and Quality
2016
Primavera P6 Professional Advanced Rel.15.2
It-Ip, Planning
2014
Quality management
Quality Management Center, Document Control, Identification of Aspects

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter